Difference between revisions of "Property:PrjLevel"
From AIRWiki
DavidLaniado (Talk | contribs) |
DavidLaniado (Talk | contribs) m |
||
Line 1: | Line 1: | ||
− | The status of a | + | The status of a project can be [[allows value::Active]] or [[allows value::Closed]]. |
Revision as of 12:47, 7 October 2009
The status of a project can be Active or Closed.
Pages using the property "PrjLevel"
Showing 25 pages using this property.
(previous 25) (next 25)next 25)